GGSP GIOVE-B in orbit
 
Home | Objectives | Architecture | GTRF | News&Events | Users | Consortium | Download | Contact | Impressum || ISDC Portal

Requirement Review

The first milestone of the GGSP project was reached with the Requirement Review (RR).
The purpose of this step was the consolidation (specification, definition and planning) of the GGSP.
In detail the following work packages were evaluated:
  • "Definition and Realisation of a Terrestrial Reference System (TRS)" (WP210) - The mathematical definition of a TRS, mathematical formulae for transformation between TRS and methods for the TRF implementation as realisation of TRS are formulated.
  • "GGSP Requirements Document" (WP220) - The internal and external requirements to the GGSP prototype are defined and summarized.
  • "GGSP Prototype External ICD" (WP230) - Interfaces between the GGSP prototype and all relevant external entities are described.
  • "Parameters and Models" (WP240) - Necessary standards to be implemented in the GGSP are specified basing on IERS standards, IAU and IUGG conventions.
Home | Objectives | Architecture | GTRF | News&Events | Users | Consortium | Download | Contact | Impressum || ISDC Portal
GGSP GIOVE-A in orbit

Valid XHTML 1.0 Transitional